{"id":3142,"date":"2017-10-26T09:52:16","date_gmt":"2017-10-26T09:52:16","guid":{"rendered":"http:\/\/navision-beratung.de\/?p=3142"},"modified":"2017-10-26T09:52:16","modified_gmt":"2017-10-26T09:52:16","slug":"referenzprojekte-der-bartolome-roeder-ag-baubranche","status":"publish","type":"post","link":"https:\/\/navision-beratung.de\/en\/referenzprojekte-der-bartolome-roeder-ag-baubranche\/","title":{"rendered":"Reference projects of bartolome r\u00f6der AG: Construction industry"},"content":{"rendered":"<p><img alt=\"\" fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-3156\" src=\"http:\/\/navision-beratung.de\/wp-content\/uploads\/2017\/10\/Baubranche.png\" width=\"785\" height=\"200\" srcset=\"https:\/\/navision-beratung.de\/wp-content\/uploads\/2017\/10\/Baubranche.png 785w, https:\/\/navision-beratung.de\/wp-content\/uploads\/2017\/10\/Baubranche-300x76.png 300w, https:\/\/navision-beratung.de\/wp-content\/uploads\/2017\/10\/Baubranche-768x196.png 768w\" sizes=\"(max-width: 785px) 100vw, 785px\" \/><\/p>\n<p>In our series of reference projects by bartolome r\u00f6der AG, we would like to present a project from the construction industry to you today.<br \/>\nThe company currently has around 250 employees, of which around 25 are Microsoft Dynamics NAV users. The goal was defined in advance to replace the interface-intensive AS\/400 process landscape and transfer it to a homogeneous process landscape. The following five company divisions were affected by the changeover to Microsoft Dynamics NAV:<\/p>\n<ul>\n<li><strong>Controlling<\/strong> with cost center accounting and cost unit accounting<\/li>\n<li><strong>Financial accounting<\/strong> with general ledger, accounts receivable ledger, accounts payable ledger, asset ledger and cash flow<\/li>\n<li><strong>Purchasing<\/strong> with order processing and the incoming invoice verification workflow<\/li>\n<li><strong>Sale<\/strong>which included order entry, down payment processing and invoicing<\/li>\n<li><strong>Project system<\/strong>which contains service specifications and the construction diary<\/li>\n<\/ul>\n<h2><strong><u>The highlights of the project<\/u><\/strong><\/h2>\n<p><strong>Highlights of the project<\/strong> were the system presentation of down payment processing and the construction diary.<\/p>\n<p>What the <strong>Down payment processing<\/strong> As far as the invoice is concerned, it should be possible to create any number of down payment invoices from any number of customer orders or purchase orders, both on the outgoing and incoming side, which should then flow into a final invoice at the end.<br \/>\nCross-document down payment processing was therefore implemented.<\/p>\n<p>Another challenge was the <strong>Construction diary<\/strong>which includes the recording of events during the implementation of a project with the option of creating various forms\/documents. In this way, events such as fault messages or change messages can be used during the project phase, e.g. for preparing quotations.<br \/>\nThe construction diary consists of two components:<br \/>\n1. the construction diary itself for recording events such as additional services, disruptions, changes to the construction process, etc.<br \/>\n2. supplementary management, which manages the documents and forms for the respective events. The content of these documents can be, for example, the duration of an incident, type of incident, comments, notes on offers already received, approvals and much more.<\/p>\n<h2><strong><u>Realization of the project<\/u><\/strong><\/h2>\n<p>The project was completed within a tight schedule of four months from commissioning to go-live. After \"Go Live\", continuous improvements were made to the system and processes were optimized.<\/p>\n<p>The customer can now build on a customized process landscape that has optimized and accelerated daily work processes.<\/p>\n<p>If you would like to improve your system landscape or are interested in a new implementation of a highly modern and flexible ERP system, please contact us on +49 (89) 21 111 848 or by e-mail at <a href=\"mailto:vertrieb@br-ag.com\">vertrieb@br-ag.com<\/a> to us.<\/p>","protected":false},"excerpt":{"rendered":"<p>In unserer Reihe der Referenzprojekte der bartolome r\u00f6der AG m\u00f6chten wir Ihnen heute ein Projekt aus der Baubranche vorstellen. Im Unternehmen sind derzeit ca. 250 Mitarbeiter t\u00e4tig, wovon ca. 25 Microsoft Dynamics NAV User sind. Im Vorfeld wurde das Ziel definiert, die schnittstellenintensive AS\/400-Verfahrenslandschaft abzul\u00f6sen und in eine homogene Verfahrenslandschaft zu \u00fcberf\u00fchren. Folgende f\u00fcnf Unternehmensbereiche [&hellip;]<\/p>","protected":false},"author":1,"featured_media":3144,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"","_seopress_titles_title":"Microsoft Dynamics NAV in der Bauwirtschaft","_seopress_titles_desc":"Erfahren Sie, wie bartolome r\u00f6der AG die AS\/400-Landschaft durch Microsoft Dynamics NAV ersetzt und Prozesse in 5 Schl\u00fcsselbereichen optimiert hat.","_seopress_robots_index":"","footnotes":""},"categories":[2],"tags":[],"class_list":["post-3142","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business-central"],"_links":{"self":[{"href":"https:\/\/navision-beratung.de\/en\/wp-json\/wp\/v2\/posts\/3142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/navision-beratung.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/navision-beratung.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/navision-beratung.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/navision-beratung.de\/en\/wp-json\/wp\/v2\/comments?post=3142"}],"version-history":[{"count":0,"href":"https:\/\/navision-beratung.de\/en\/wp-json\/wp\/v2\/posts\/3142\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/navision-beratung.de\/en\/wp-json\/wp\/v2\/media\/3144"}],"wp:attachment":[{"href":"https:\/\/navision-beratung.de\/en\/wp-json\/wp\/v2\/media?parent=3142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/navision-beratung.de\/en\/wp-json\/wp\/v2\/categories?post=3142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/navision-beratung.de\/en\/wp-json\/wp\/v2\/tags?post=3142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}